2003/01/24 Macedonian Church

This project was to design all the electrical work for the new addition of the Existing Macedonian Church, site visit for the existing building was done and the follwoing pictures show some of the video pictures that were taken:

Existing FAS Existing FAS Existing FAs Existing FAS Existing FAS Existing FAS

This project has 5 Plans as follow:

2003/01/27 Kelseys and Rogers Building

This project was to design the lighting and power new town of LakeShore Kelsey's and Rogers Building for Rocco Tullio, which has 3 Plans.

2003/02/05 General Essex District School Board FAS

This project was to update the existing Fire Alarm System(FAS) for eight General Essex District Shools, which are East Mersea public school, General Amherst School, Harrow Junior Public School, Kingsville Public School, Leamington District School, Sandwich WEst School, Queen Elizabth public school, and Maplewood Public School. Site visits were done for some of these schools and video taping for some of the old fire alarm panels and other fire alarm system components were done as well. The first Preliminary Drawings set was done, which has nine floor plans for the schools.

the following pictures show some of the existing FAS panels and components that were taking during the site visit:

Existing FAS Existing FAS Existing FAs Existing FAS Existing FAS

2003/02/10 JGD Electric

This project was to design the lighting and power work for plant expansion for M & G Tool, which has 2 Plans.

2003/02/20 Michaels Store

This project was to design all the electrical work for Micheals store,which has 8 Plans.

2003/03/17 University of Windsor Chrysler Hall Tower Fire Alarm System project

Chrysler Hall South Chrysler Hall Tower Chrysler Hall Tower Chrysler Hall North

Chrysler hall Building was build 1964, it is the main administrative building on University of Windsor campus. Most of University of Windsor offices are within this building, such as The President and vice-President offices, registrar office, graduate and research office and other more offices. There are three sections of this building, Chrysler Hall South, Chrysler Hall North, and Chrysler Hall Tower. Each of the South and the North sections has three floors including the basement, and the Tower section has seven floors including the basement.

The project was to upgrade the existing Fire Alarm System(FAS) of the building to a recent FAS. AutoCAD 2002 program was used to design the FAS plans for the building. The first Preliminary Drawings Set of the project was done, and it consists of four plans, First plan represents the FAS for three sections of the Basement floor plan, Second plan represents the FAS for the three sections of the first floor plan, Third Plan represents the FAS for the three section of the second floor plan, and finally the Fourth Plan represent the 3rd, 4th, 5th, and 6th floor plans for the tower section.

2003/08/13 University of Windsor Campus Video Surveillance project

The project was to design a Video Surveillance System for the University of Windsor Campus parking lots

2003/11/10 Docherty Subdivision project

The project was to design the layout for the Transformers for all the houses in the subdivision and the street lights for the subdivsion. The projcet had eight plans: